The reporting period runs from January 1 through December 31, 2025 and covers Datacenter United’s Belgian activities under its operational control. The scope includes 13 operational data centers across 11 locations. Four of these data centers were added to the reporting scope during 2025 and are therefore included for ten months rather than for the full calendar year. Mouscron is excluded because the site was not operational during the reporting period.
The 2025 figures consequently reflect a larger operational platform than the 2024 baseline, while not every data center is represented for the same number of months. Absolute figures for electricity, greenhouse gas emissions, water, and other environmental indicators are therefore not fully comparable with 2024. Data coverage may also vary by indicator and is explained in more detail in the full Sustainability Report.